(首页)www.js1388(中国)官方网站·App Store

十大产品 英文手机第三个

Smart grid and energy technology

Top ten Product series

Shengsi Haifeng Project Of CGN


 
Cyg electric co.,ltd. assisted in the successful power transmission of the Shengsi offshore wind power project of CGN.The total length of the main submarine cable of the Shengsi Haifeng Project of CGN is 47.2km,The key process of grid connection is the laying and connection of 220 kV sea and land cables. All sea and land cable connectors use cable accessories from Cyg electric Co., Ltd., and a total of 33 sets of sea and land cable connectors and terminals are required.

The main submarine cable needs to cross the Donghai Bridge, natural gas pipeline, four navigation channels, and four communication optical cables in a forward direction,It is by far the largest diameter, longest length, and most complex construction condition of 220 kV submarine cable in China.After receiving the project task, Cyg electric co.,ltd. quickly organized 12 engineering and technical personnel,Arrive at the installation point of land cable joint and submarine cable joint as soon as possible,Work in shifts 24 hours a day and night, and finally successfully complete the full penetration of sea and land cables.


XML 地图
XML 地图